|
Sewer Taps
A sewer connection includes a sewer tap from a sewer main located in
the right-of-way or easement. City crews will install the tap and wye.
The location of the tap shall be marked by the contractor and meet the
guidelines
stated
in the Phoenix City Code. The contractor is responsible for installing
the line from the wye to the property line.
| SIZE |
FEE |
| 6" standard tap |
$ 95 |
| Residential ROW permit |
$160 |
| Commercial ROW permit |
$240 |
| Bond |
$500 |
If you have additional question contact Water Services Technical Support
division at 602-495-5601.
Last modified on
02/18/2009 13:01:17 |