The formal bid results are the final computations of each bidders bid after the City has reviewed, checked and revised, as required, the bid proposals. It contains the quantity and the per unit cost for each item and the total bid from the lowest five contractors.
| Bid Date | Project | Description |
|---|---|---|
| 9/1/09 2:00 PM | ST85100087FBT | 43rd Avenue Paving: Baseline Road to Southern Avenue |
| 8/18/09 2:00 PM | WP083298PVT | Fire Protection/Domestic Water System - Private Job |
| 6/30/09 2:00 PM | ST87400136-T | Fractured Aggregate Surface Treatment (FAST) |
| 6/16/09 2:00 PM | WS85500336R-T | Water Main Replacement - Rebid |
| 6/9/09 2:00 PM | KIVA4403 | Offsite Improvements for Paradise Valley Mall |
| 6/9/09 2:00 PM | WS85500323-T | 6th / 8th Avenue Water Main |
| 6/2/09 2:00 PM | ST87750081 | Andulucia Phase III, IV - Sidewalk Improvements - CDBG |
| 5/12/09 12:00 PM | WS85210001-1 | GAC Recycling Facilty-3 |
| 5/5/09 2:00 PM | ST85100161 | Van Buren: 75th Ave. to 67th Ave. |
| 4/28/09 2:00 PM | ST83120034 | 23rd Avenue/Roeser Road Detention Basin Project |
| 4/28/09 2:00 PM | KIVA-083766 | Lower Buckeye 16-Inch Public Waterline - Private Job |
| 4/21/09 2:00 PM | ST87400132 | 2009 Portland Cement Concrete Repair |
| 3/24/09 2:00 PM | WS85010044-2 | Replacement of Well No. 281 |
| 3/10/09 2:00 PM | ST85100171 | Storm Drain: Southern: 31-19 Avenue |
| 2/24/09 2:00 PM | ST87400129-1 | 2009 Slurry Seal Program |
| 1/21/09 2:00 PM | PD0000058t | So. Mountain Precinct Addition |
| 1/21/09 2:00 PM | WS85500336 | Water Main Replacement Project |
| 12/16/08 2:00 PM | ST87400128 | 2009 Residential Street Overlay Program |
| 12/2/08 2:00 PM | ST874000127 | 2009 Major and Collector Street Overlay Program |
| 11/25/08 2:00 PM | ST87750100 | Maryvale Phase II Piccadilly - Sidewalk Improvements |
| 11/18/08 2:00 PM | ND30070238 | 24th Street Trail: Rio Salado to Roeser Road |
| 10/28/08 2:00 PM | PW16810004 | SR 85 Landfill Stormwater Control System |
| 10/28/08 2:00 PM | ST87440022 | Pave Dirt Roads - Various Locations |
| 8/19/08 2:00 PM | PW16810002 | SR 85 Landfill Cell 1 - Phase |
| 7/1/08 12:00 AM | ST87400110 | 2009 Major & Collector Street Overlay Program (Rev) |
| 7/1/08 12:00 AM | ST87400102 | 2007 Major & Collector Street Overlay Program |
| 5/6/08 12:00 AM | WS90400022 | Lift Station No. 51 Repairs |
| 5/6/08 12:00 AM | ST85100089 | Paving McDowell Road: 75th-83rd Avenues |
| 5/6/08 12:00 AM | WS85500316 | Water Main Replacement: Central Ave - 7th Street |
| 5/6/08 12:00 AM | ST87750094 - CDBG | Maryvale: Phase 1, 64th Drive: Osborn Rd-Indian School Road |
| 5/6/08 12:00 AM | ST83110064 | Storm Drain 27th Ave: Roeser - Broadway |
| 5/6/08 12:00 AM | ST87400116 | 2008 Portland Cement Concrete Repair 2 |
| 5/6/08 12:00 AM | ND30050070R | Neighborhood Learning Center - ReBid (CDBG) |
| 4/29/08 12:00 AM | ST85100275 | Cave Creek Road: Beardsley to Rose Lane |
| 4/22/08 12:00 AM | ST83120038 | Santa Maria Basin: 71st Avenue and Elwood |
| 4/8/08 12:00 AM | WS85800005 | Remote Facilities Security Projects: 64th Street Reservoirs |
| 4/8/08 12:00 AM | ST85100227t | Paving 44th Street & Indian School Road |
| 3/11/08 12:00 AM | ST87100156 | Palomino Sidewalks Phase 1, Area II. |
| 3/11/08 12:00 AM | ST87100148 | Palomino Sidewalks Phase II Area 1&2 |
| 3/4/08 12:00 AM | WS85050034 | Reservoir 1-ES3 Roof Rehabilitation & Misc. Repairs |
| 3/4/08 12:00 AM | ST89320046 | 2nd Avenue Street Scape: Fillmore to Roosevelt |
| 2/26/08 12:00 AM | ST85100229 | 51st Ave: Dobbins Rd to Laveen Conveyance Channel |
| 2/12/08 12:00 AM | ND30050070 | Neighborhood Learning Center |
| 1/29/08 12:00 AM | FT70120004 - FTA | Paradise Valley Mall Transit Center Refurbishment |
| 1/29/08 12:00 AM | ST87400113 | 2008 Slurry Seal Program |
| 1/8/08 12:00 AM | ST87400109 | 2008 Alley Way Dustproofing |
| 1/8/08 12:00 AM | PA75200383 | Sueno Park Sidewalk and Area Lights |
| 1/8/08 12:00 AM | PA75200383 | Sueno Park Sidewalk and Area Lights |
| 12/18/07 12:00 AM | ST87400111 | 2008 Major & Collector Street Overlay Program |
| 11/27/07 12:00 AM | WS85500285 | 48-inch Water Main Indian School Road Crossing @ Hwy 101 |
| 9/25/07 12:00 AM | ST89320052 FHW | Pedestrian School Safety Zone: Phase II |
| 9/18/07 12:00 AM | ST87110086 | Paving Meadowbrook: 7th - 12th Streets |
| 8/28/07 12:00 AM | WS85010040 | Water Main: 99th Avenue & Southern Avenue |
| 8/14/07 12:00 AM | ST85100228 | 51st Avenue: Laveen Conveyance Channel to Salt River |
| 8/7/07 12:00 AM | PA75200277-CDBG | Cielito Park Restroom Facility |
| 5/15/07 12:00 AM | ST85100269 | Jomax Road, I-17 Norterra Parkway |
| 5/8/07 12:00 AM | WS85050023 | Tank & Site Improvements: Well 276, Well 290, Well 294 |
| 5/1/07 12:00 AM | ST85100035 | 67th Avenue, Buckeye to Van Buren Paving & 67th Avenue Box Culvert at Harrison Street |
| 4/24/07 12:00 AM | ST85100027ReBid | Paving & Waterline 52nd Street: McDowell Road to Thomas Road (ReBid |
| 4/24/07 12:00 AM | ST87400101 | 2007 Portland Cement Concrete Repair |
| 4/24/07 12:00 AM | ST83130234 | Denton Lane Alley Storm Drain |
| 4/17/07 12:00 AM | ST87750079 | Andalucia Phase I and II Sidewalk Improvements. |
| 4/17/07 12:00 AM | ST85100096 | Paving and Storm Drain 75th Avenue: Buckeye/Van Buren |
| 4/3/07 12:00 AM | ST85100130t | Van Buren Street Paving Improvements: 67th Ave/59th Ave. |
| 3/27/07 12:00 AM | ST87600051- FHWA | Isaac Pedestrian Bridge At McDowell Road / 34th Avenue (FHWA). |
| 3/13/07 12:00 AM | ST83130249 | 9th Avenue Storm Drain: Peoria Avenue To ACDC |
| 1/30/07 12:00 AM | ST85100048 | 35th Avenue Paving: Southern Ave to Broadway Road |
| 1/30/07 12:00 AM | WS85010041 | Drilling and Installation of City of Phoenix Well No. 299 |
| 1/17/07 12:00 AM | ST87400103 | 2007 Slurry Seal Program |
| 12/19/06 12:00 AM | PW16810003 | SR 85 Landfill Flare Station & Gas System PLans |
| 12/19/06 12:00 AM | ST85100046 | Camelback Road Paving: 107th Ave-99th Ave; Camelback Road Storm Drain |
| 12/12/06 12:00 AM | ST87100127 - CDBG | 27th Avenue Paving: Deer Valley to Foothills; 27th Ave Storm Drain CDBG |
| 11/28/06 12:00 AM | WS85500282 | 7th Avenue Water Main Replacement - Jackson Street to Apache Street |
| 11/21/06 12:00 AM | ST83120017 | 24th Avenue & Camelback Basin and Storm Drain Improvement and Bid Alternates |
| 10/31/06 12:00 AM | ST87400106 | 2006/2007 Alley Dust Proofing |
| 10/31/06 12:00 AM | PW16810001 | SR85 Landfill Cell 1 Phase 2 Excavation & Lining |
| 9/19/06 12:00 AM | ST87600036 - FHW | 5st Ave./Cactus Rd. ACDC Trail Underpass |
| 8/29/06 12:00 AM | PT70130002 FTA | Transit Operating Facility Refurbishments - 2006 North and South Operating Facilities |
| 7/25/06 12:00 AM | PT68120002 FTA - ReBid | Sunnyslope Transit Center Refurbishments ReBID. |
| 7/25/06 12:00 AM | WS90500189 | Sanitary Sewer Relief & Replacement Program |
| 6/20/06 12:00 AM | WS85500267 | Water Main Replacement: ABB 31st Ave/Roosevelt/ (35th Ave/Van Buren) |
| 6/20/06 12:00 AM | ST87750057 | Sidewalk Improvements 42nd PL: Grovers Ave to (Union Hills Dr.) |
| 6/13/06 12:00 AM | WS85500268 | Water Main Replacement: ABB 27th Ave/Roosevelt/31st Ave/Van Buren Street. 31st Ave/Van Buren Street |
| 5/31/06 12:00 AM | ST85100027 | Paving 52nd Street: McDowell Road / Thomas Road |
| 5/31/06 12:00 AM | ST85100220 | Baseline Road and 35th Avenue Re-Alignment |
| 5/9/06 12:00 AM | WS90500180 | Sewer & Manhole Corrosion Control Crown Spray Program 2005-06 |
| 4/12/05 12:00 AM | WS85500259 | Annual Water and Sewer Emergency Repair Contract |