Bid Date Project Description
9/1/09 2:00 PM ST85100087FBT 43rd Avenue Paving: Baseline Road to Southern Avenue
8/18/09 2:00 PM WP083298PVT Fire Protection/Domestic Water System - Private Job
6/30/09 2:00 PM ST87400136-T Fractured Aggregate Surface Treatment (FAST)
6/16/09 2:00 PM WS85500336R-T Water Main Replacement - Rebid
6/9/09 2:00 PM KIVA4403 Offsite Improvements for Paradise Valley Mall
6/9/09 2:00 PM WS85500323-T 6th / 8th Avenue Water Main
6/2/09 2:00 PM ST87750081 Andulucia Phase III, IV - Sidewalk Improvements - CDBG
5/12/09 12:00 PM WS85210001-1 GAC Recycling Facilty-3
5/5/09 2:00 PM ST85100161 Van Buren: 75th Ave. to 67th Ave.
4/28/09 2:00 PM ST83120034 23rd Avenue/Roeser Road Detention Basin Project
4/28/09 2:00 PM KIVA-083766 Lower Buckeye 16-Inch Public Waterline - Private Job
4/21/09 2:00 PM ST87400132 2009 Portland Cement Concrete Repair
3/24/09 2:00 PM WS85010044-2 Replacement of Well No. 281
3/10/09 2:00 PM ST85100171 Storm Drain: Southern: 31-19 Avenue
2/24/09 2:00 PM ST87400129-1 2009 Slurry Seal Program
1/21/09 2:00 PM PD0000058t So. Mountain Precinct Addition
1/21/09 2:00 PM WS85500336 Water Main Replacement Project
12/16/08 2:00 PM ST87400128 2009 Residential Street Overlay Program
12/2/08 2:00 PM ST874000127 2009 Major and Collector Street Overlay Program
11/25/08 2:00 PM ST87750100 Maryvale Phase II Piccadilly - Sidewalk Improvements
11/18/08 2:00 PM ND30070238 24th Street Trail: Rio Salado to Roeser Road
10/28/08 2:00 PM PW16810004 SR 85 Landfill Stormwater Control System
10/28/08 2:00 PM ST87440022 Pave Dirt Roads - Various Locations
8/19/08 2:00 PM PW16810002 SR 85 Landfill Cell 1 - Phase
7/1/08 12:00 AM ST87400110 2009 Major & Collector Street Overlay Program (Rev)
7/1/08 12:00 AM ST87400102 2007 Major & Collector Street Overlay Program
5/6/08 12:00 AM WS90400022 Lift Station No. 51 Repairs
5/6/08 12:00 AM ST85100089 Paving McDowell Road: 75th-83rd Avenues
5/6/08 12:00 AM WS85500316 Water Main Replacement: Central Ave - 7th Street
5/6/08 12:00 AM ST87750094 - CDBG Maryvale: Phase 1, 64th Drive: Osborn Rd-Indian School Road
5/6/08 12:00 AM ST83110064 Storm Drain 27th Ave: Roeser - Broadway
5/6/08 12:00 AM ST87400116 2008 Portland Cement Concrete Repair 2
5/6/08 12:00 AM ND30050070R Neighborhood Learning Center - ReBid (CDBG)
4/29/08 12:00 AM ST85100275 Cave Creek Road: Beardsley to Rose Lane
4/22/08 12:00 AM ST83120038 Santa Maria Basin: 71st Avenue and Elwood
4/8/08 12:00 AM WS85800005 Remote Facilities Security Projects: 64th Street Reservoirs
4/8/08 12:00 AM ST85100227t Paving 44th Street & Indian School Road
3/11/08 12:00 AM ST87100156 Palomino Sidewalks Phase 1, Area II.
3/11/08 12:00 AM ST87100148 Palomino Sidewalks Phase II Area 1&2
3/4/08 12:00 AM WS85050034 Reservoir 1-ES3 Roof Rehabilitation & Misc. Repairs
3/4/08 12:00 AM ST89320046 2nd Avenue Street Scape: Fillmore to Roosevelt
2/26/08 12:00 AM ST85100229 51st Ave: Dobbins Rd to Laveen Conveyance Channel
2/12/08 12:00 AM ND30050070 Neighborhood Learning Center
1/29/08 12:00 AM FT70120004 - FTA Paradise Valley Mall Transit Center Refurbishment
1/29/08 12:00 AM ST87400113 2008 Slurry Seal Program
1/8/08 12:00 AM ST87400109 2008 Alley Way Dustproofing
1/8/08 12:00 AM PA75200383 Sueno Park Sidewalk and Area Lights
1/8/08 12:00 AM PA75200383 Sueno Park Sidewalk and Area Lights
12/18/07 12:00 AM ST87400111 2008 Major & Collector Street Overlay Program
11/27/07 12:00 AM WS85500285 48-inch Water Main Indian School Road Crossing @ Hwy 101
9/25/07 12:00 AM ST89320052 FHW Pedestrian School Safety Zone: Phase II
9/18/07 12:00 AM ST87110086 Paving Meadowbrook: 7th - 12th Streets
8/28/07 12:00 AM WS85010040 Water Main: 99th Avenue & Southern Avenue
8/14/07 12:00 AM ST85100228 51st Avenue: Laveen Conveyance Channel to Salt River
8/7/07 12:00 AM PA75200277-CDBG Cielito Park Restroom Facility
5/15/07 12:00 AM ST85100269 Jomax Road, I-17 Norterra Parkway
5/8/07 12:00 AM WS85050023 Tank & Site Improvements: Well 276, Well 290, Well 294
5/1/07 12:00 AM ST85100035 67th Avenue, Buckeye to Van Buren Paving & 67th Avenue Box Culvert at Harrison Street
4/24/07 12:00 AM ST85100027ReBid Paving & Waterline 52nd Street: McDowell Road to Thomas Road (ReBid
4/24/07 12:00 AM ST87400101 2007 Portland Cement Concrete Repair
4/24/07 12:00 AM ST83130234 Denton Lane Alley Storm Drain
4/17/07 12:00 AM ST87750079 Andalucia Phase I and II Sidewalk Improvements.
4/17/07 12:00 AM ST85100096 Paving and Storm Drain 75th Avenue: Buckeye/Van Buren
4/3/07 12:00 AM ST85100130t Van Buren Street Paving Improvements: 67th Ave/59th Ave.
3/27/07 12:00 AM ST87600051- FHWA Isaac Pedestrian Bridge At McDowell Road / 34th Avenue (FHWA).
3/13/07 12:00 AM ST83130249 9th Avenue Storm Drain: Peoria Avenue To ACDC
1/30/07 12:00 AM ST85100048 35th Avenue Paving: Southern Ave to Broadway Road
1/30/07 12:00 AM WS85010041 Drilling and Installation of City of Phoenix Well No. 299
1/17/07 12:00 AM ST87400103 2007 Slurry Seal Program
12/19/06 12:00 AM PW16810003 SR 85 Landfill Flare Station & Gas System PLans
12/19/06 12:00 AM ST85100046 Camelback Road Paving: 107th Ave-99th Ave; Camelback Road Storm Drain
12/12/06 12:00 AM ST87100127 - CDBG 27th Avenue Paving: Deer Valley to Foothills; 27th Ave Storm Drain CDBG
11/28/06 12:00 AM WS85500282 7th Avenue Water Main Replacement - Jackson Street to Apache Street
11/21/06 12:00 AM ST83120017 24th Avenue & Camelback Basin and Storm Drain Improvement and Bid Alternates
10/31/06 12:00 AM ST87400106 2006/2007 Alley Dust Proofing
10/31/06 12:00 AM PW16810001 SR85 Landfill Cell 1 Phase 2 Excavation & Lining
9/19/06 12:00 AM ST87600036 - FHW 5st Ave./Cactus Rd. ACDC Trail Underpass
8/29/06 12:00 AM PT70130002 FTA Transit Operating Facility Refurbishments - 2006 North and South Operating Facilities
7/25/06 12:00 AM PT68120002 FTA - ReBid Sunnyslope Transit Center Refurbishments ReBID.
7/25/06 12:00 AM WS90500189 Sanitary Sewer Relief & Replacement Program
6/20/06 12:00 AM WS85500267 Water Main Replacement: ABB 31st Ave/Roosevelt/ (35th Ave/Van Buren)
6/20/06 12:00 AM ST87750057 Sidewalk Improvements 42nd PL: Grovers Ave to (Union Hills Dr.)
6/13/06 12:00 AM WS85500268 Water Main Replacement: ABB 27th Ave/Roosevelt/31st Ave/Van Buren Street. 31st Ave/Van Buren Street
5/31/06 12:00 AM ST85100027 Paving 52nd Street: McDowell Road / Thomas Road
5/31/06 12:00 AM ST85100220 Baseline Road and 35th Avenue Re-Alignment
5/9/06 12:00 AM WS90500180 Sewer & Manhole Corrosion Control Crown Spray Program 2005-06
4/12/05 12:00 AM WS85500259 Annual Water and Sewer Emergency Repair Contract