​​​​​​​​​​​ATTENTION!

***New Permit System Process, Please Read ***

 

With great anticipation, Fire Prevention has started a transition to a new time savings and customer friendly permitting system called Shape Phx effective June 6, 2022. This system provides an enhanced user experience with easier navigation and more self-service options for you, our customer. Shape Phx manages application intake, inspection requests, workflow, permit status, and reports. This new secure system significantly benefits our customers through improved customer service, added transparency, and increased efficiency of services that the Phoenix Fire Department provides to our community. The best part of Shape Phx for our customers is the “Shape Phx Customer Portal." The Portal is available 24/7 and allows customers that register to do the following from any location; submit applications, check plan review status, request meetings with staff, upload documents, request inspections and pay fees online. 

If your application request is for one or more of the below permits, you will now need to complete the application process online. Applications for these permits will no longer be accepted via email for processing. If your application is for any other type of fire permit or plan review, it will be processed as before via this email in box until the second system release in 2023. 

The first phase includes the following permits: 

  • Hospitals 
  • Nursing Care Facilities 
  • Day Care and Child Care Facilities 
  • Group Homes 
  • Assisted Living Facilities 
  • Developmentally Disabled Group Homes 
  • Educational Facilities (K-12) 
  • Malls 
  • Behavioral Health Facilities 
  • Medical Facilities 

​The link for the Shape Phx portal and to apply for a permit is now https://shapephx.phoenix.gov/s/  

You may also contact Fire Prevention at 602-262-6771 or pfd.prevention@phoenix.gov with question pertaining to the new system and application processing.  ​


Forms and Applications​​​​​​​​​​​​​​​​​​​​​​​

Note: The documents below are available in Adobe Acrobat (PDF) format, download a free copy at http://get.adobe.com/reader/ and follow the onscreen instructions.


​Permit application packages that are not complete will not be accepted.

New Construction - When applying for a permit with Fire Prevention it is important to note the following are required as part of the submittal and permit application process.

  • ​Site Plans & Fire Protection Systems require hard copy plan submittal. Documents shall be drawn to scale and printed to scale.
  • Electronic media documents are allowed to be submitted where approved by the fire code official for any non-life safety equipment. 
  • Construction documents shall be of sufficient clarity to indicate the location, nature and extent of the work proposed and show in detail that it will conform to the provisions of this code and relevant laws, ordinances, rules and regulations.
  • Two sets of accurate and legible plans shall be submitted to the fire code official for approval prior to the issuance of a permit, in the following scale:  Site Plans [1 inch = 50 feet]       Fire Protection Systems [1/8 inch = 1 foot]  Use for: Hydrant Flow Test, Fire Sprinkler, Fire Pump, Standpipe, Alt. Surface Fire Apparatus Access, Fire Alarm, Fire Line/ Civil, Kitchen Hood
  • Other scales may be used with prior approval from the fire code official.
  • Submittals require a bar graph scale on each page and directional arrow. 

A Certificate of Occupancy (CofO) may be required with the permit application. Click here to obtain a copy of the current CofO.  

If you'd like to pay with a credit card please complete the form and fax (602-495-7429) it with your application, or check and cash can be taken at the Fire Prevention office located at 150 South 12th Street Phoenix, AZ 85034 Monday-Friday 8AM-4PM.     

Click here​ for Credit Card Form​ ​ - Please Do Not Email ​




​Permit Applications & Checklist Bundles​ ​​
Agro Industrial and Solid Biomass
​Ammunition
Amusement Buildings, Haunted Houses & Mazes
Appeal to the Fire Marshal/Engineering Interpretation Application​​      
Aviation Facility
Battery Energy Storage Systems Over the Counter 
​​Battery, Commercial Installation
Battery & Solar Combo Over the Counter
Blasting
Bonfire
Business Certificate ​- Fire Protection Company​​
​Candles or Open Flame Display
​​Carbon Dioxide Liquid Beverage System
Cellulose Nitrate
Combustible Dust or Fiber Producing Operations
Combustible Storage Including Wood Products & Idle Pallets
Controlled Burn
Dry Cleaning Facility
​Energy Systems Inspection Request Form
​​Fleet Fueling​​
​​Fire Performers
​​Fireworks Indoor Sales
Fireworks Outdoor Sales
Fireworks Wholesale Sal​es
​​FITM (Fire Inspection, Testing & Maintenance) Plan Review Application
FITM (Fire Inspection, Testing & Maintenance) OTC Permit
Flammable/Combustible Tank Abandon, Removal, Slurry Fill, Temporarily Place out of Service
​​Flammable Finish Operations
Floor Finishing
Fruit and Crop Ripening Facility
Fumigation and Insecticidal Fogging
General Fire Inspection
​​Hazardous Material Facility Permit Application
Hazardous Materials Inventory Spreadsheet ​- (Excel spreadsheet)
​​Hazardous Materials Production (HMP) Facility
​​High-Piled Combustible Storage
High-Piled Storage Facility Operating Permit​ ​​
Hot Work Permit​ / Program​​
Industrial Ovens
LP-Gas Exchange Program
​LP-Gas Operating Permit
​​LP-Gas Flame Effect Permit​​
LP-Gas Tank - <125 gallons, Slurry Fill, Flare off or Abandon
Lumber Yards and Woodworking Facilities
Magnesium
Miscellaneous Combustible Storage
Mobile Fleet Fueling Operations - Vehicle & Site Permits
​​Motor Vehicle Fuel Dispensing Facility
Mulch Yard
Open Burning​​
Organic Coating Manufacturing
​Pallet Facility
Plant Extraction Facility
Place of Assembly Permit-Occupant Load​​
Private Hydrant Flow Test​ ​​
Pyrotechnics / Fireworks​​​
Pyroxylin Plastics
Refrigeration Equipment
Removal Permit​ ​(fire protection equipment) 
Repair Garages
Rooftop Heliport Operation
Salvage or Junkyard Operation
Semi Conductor Facility
Solar Photovoltaic Power Systems Over the Counter​
Solar & Battery Combo Over the Counter
​Solar, Commercial Installation
Special Event - Indoor Assembly
Special Event - Outdoor Assembly
Tents and Temporary Membrane Structures
Temporary Indoor Building Use
Tire Rebuilding Operation
Tire Storage 
Trade Shows & Exhibits 
Vehicle Display
Waste Handling or Recycling Operations
Welding Permit
Wrecking Yards
Woodworking Operations