The project wil​l upgrade the current pedestrian access route along Cave Creek Road and Contention Mine Road to incorporate missing or noncompliant sections of sidewalk, curb ramps and driveways to meet all ADA standards.  The project limits are along Cave Creek Road from Angela Drive to Marco Polo Road and along Contention Mine Road from Cave Creek Road to 26th Street. Project improvements include roadway widening, upgrading existing traffic signals and street lighting to meet the current city standards; and adding new curb, gutter, sidewalks, curb ramps, bus pads and landscaping in some locations.

Project Highlights

  • Roadway widening
  • Microseal and stripe Cave Creek Road
  • New curb, gutter, sidewalk, ADA ramps and landscaping
  • Traffic signals and street lights
  • Add buffers to existing bicycle lanes on Cave Creek Road
  • Storm drain improvements
  • Driveway reconstruction
  • Retaining walls
  • Relocate overhead powerlines underground on Contention Mine Road

​Goals of the Project

  • Improve pedestrian safety and mobility

Anticipated Schedule

2020     Design (Currently at 90% design phase)

              VIrtual Recorded Project Update - August 2020 *details soon*

2021     Construction (Dependent on funding and contractor schedules)

*New* Roll Plots Showing Design Details

Angela Drive to North of Union Hills DriveSouth of East Morrow Drive to East Marco Polo RoadContention Mine Road


Project Contact

Tariq Momika
602-534-7062

tariq.momika@phoenix.gov

 

To Receive Project Updates by Email

Send a message referencing Cave Creek Road Project to

agranillo@gciaz.com


 

Updated August 2020


 


 Project Area

illustration of key features