Description
Street reconstruction project to widen and re-pave the roadway, upgrade street lights and signals to new city standards, repair sidewalks and add a new storm drain to improve roadway drainage and reduce street flooding.
Project Highlights
- Widen roadway to add a two-way left turn lane
- New pavement
- Sidewalk repairs
- Street light upgrades
- Traffic signal improvements
- New storm drain
Goals of the Project
- Improve traffic flow by providing a dual left turn lane for commercial vehicles to access properties in this industrial area
- Improve the roadway surface
- Improve pedestrian safety and connectivity
- Improve drainage
- Improve street lighting and signals
Anticipated Project Schedule
Design Finalized - waiting on Utility Coordination
Right of Way Acquisition - Anticipated to be completed by spring of 2021
Construction - Anticipated to begin by the summer of 2021
Project Contact
Jose M. Rodriguez
602-262-4054
jose.m.rodriguez@phoenix.gov
Updated December 2020