Mitchell Drive: Central to 3rd Street
This project will entail the design of a 5-foot sidewalk where missing and upgrade to meet current PROWAG standards. Reconstruct one alley entrance, multiple driveways and add vertical curb.
Update Americans with Disabilities Act (ADA) curb ramps along Central and Include pavement treatment. Add six new streetlights, 200 feet apart, and relocate fire hydrants, water meters, and a pressure backflow unit.
Final design is anticipated in Winter of 2027