7th Street from Mineral Road to Dobbins Road Project
About the Project
The Phoenix Street Transportation Department is proposing an update to the parking and bike lanes on 7th Street from Mineral Road to Dobbins Road.
If approved, the timeline for the project would be winter/spring 2023.
Project Details
The department is proposing two options for this roadway:
- Option A: No changes would be made along this stretch of road.
- Option B: Widening the 10.5 ft wide driving lanes to 11 ft., and replacing the 7 ft. parking lanes with a 6.5 ft. bike lanes.
Project Area
Information coming soon.
Pre-recorded Presentation
Watch the pre-recorded presentation posted above, or available via YouTube.
Contact the Project Team
E-mail bike@phoenix.gov to submit a question to the project team.