7th Avenue and Mountain View Road Improvements

​​​​​​​​​​​​

Description

This project will make sidewalk and street improvements on 7th Avenue from Mountain View Road to Cheryl Drive and on Mountain View Road from 7th Avenue to 3rd Drive.  The project includes constructing new sidewalks where none currently exist, reconstructing and widening existing sidewalks to meet new city ADA standards, installing new ADA sidewalk ramps, constructing new driveways and reconstructing existing driveways, installing curb and gutter, street paving, removing and replacing catch basins, relocating fire hydrants and installing new LED streetlights. It will also include a 10-foot-wide multi-use path along the east side of 7th Avenue from Mountain View Road to Cheryl Drive.  A signalized pedestrian crossing ​​(HAWK) will be installed at 7th Avenue and Cheryl Drive to facilitate the movement of pedestrians and bicyclists across 7th Avenue.


​Project Highlights

  • New sidewalks
  • New driveway construction and driveway reconstruction
  • New and reconstructed ADA ramps
  • Street paving
  • New street lighting
  • 10-foot multi use path 
  • High Intensity Activated Crosswalk (HAWK) 

Goals of the Project

  • Improve pedestrian access and connectivity, and meet new Americans with Disability Act (ADA) guidelines.

Schedule

  • Design anticipated to be complete spring of 2023     
  • Construction anticipated to begin summer 2023

Project Contact

Paul NjiRaini
(602) 534-7056
paul.njiraini@phoenix.gov​


Updated September 2022

 Project Area