Forms & Applications

​​​​​​​​​​​​​​​​​​​​Note: The documents below are available in Adobe Acrobat (PDF) format,  download a free copy at http://get.adobe.c​om/reader/ and follow the onscreen instructions.



The catalog below contains downloads for permit application submittals.  The downloads are complete packages including:

  • The permit application
  • A submittal checklist where applicable
  • A credit card authorization form

Permit application packages that are not complete will no longer be accepted.

New Construction - An Admin Prelog Form is required for all permits that requires a plan review.  This document indicates everything that is required for a complete submittal.  A current Certificate of Occupancy (CofO) is required for all new construction permits and some general and operating permits.  Click here  to obtain a copy of the current CofO.  If you'd like to pay with a credit card please complete the credit card form and fax it with your application, or check and cash can be taken at the Fire Prevention office.  

​Permit Applications & Checklist Bundles ​Certificate of Occupancy Required
Amusement Buildings, Haunted Houses & Mazes  - Must be submitted 10 business days in advance of event.
Assisted Living Facilities​Yes
Annual Open Flame/Candles
Annual Vehicle Displays               
Behavioral Health Facilities Yes​
Blasting Operations
Bonfire -- Check with the County for "No Burn Day" - Must be submitted 10 business days in advance of event.
Business Certificate - Fire Protection Company
Daycare or Preschool --Note: If a daycare is located inside a school facility a Daycare permit is required by the City and AZDHS.​Yes
Certificate of Fitness - Blasters
Certificate of Fitness - Pyrotechnicians
Combustible Dust or Fiber Producing Operations
Combustible Storage Including Idle Pallets, Tires etc.Yes​
Controlled Burn -- Check with the County for "No Burn Day" - Must be submitted 10 business days in advance of burn.
Correctional Facilities​Yes
Developmentally Disabled Group Home​Yes
Educational Facilities K-12 Inspection Checklist - self inspection only - no permits issued at this time
Fire Performers - Must be submitted 10 business days in advance of event.
Flammable/Combustible Tank Abandon, Removal, Slurry Fill, Temporarily Place out of Service
General Operating Permits Application
Hazardous Materials Inventory Spreadsheet - this is an Excel spreadsheet .
High-Piled Storage Facility
Hot Work Program
Juvenile Group Home​Yes
LPG Exchange Program
LPG Tank Slurrey Fill, Flareoff or Abandon
Lumber Yards
Medical Facilities​Yes
Mobile Fleet Fueling - Vehicle & Site Permits
Motor Vehicle Fuel Dispensing
Mulch Yard
Public Assemby Permit Occupant Load may be established if applicable
Pyrotechnics Indoor & Outdoor
Removal Permit (fire protection equipment) -- Fire Protection Equipment Removal Checklist
Rooftop Heliport Operation
Salvage or Junkyard Operation
School Inspection Checklist
Semi Conductor Facility
Special Event - Indoor
Special Event - Outdoor 
Tents, Canopies and Temporary Membrane Structures
Temporary Indoor Building Use
Tire Rebuilding Operation
Tire Storage of Used or Waste Tires 
Trade​ Shows & Exhibits 
Welding Permit
Wrecking Yards
Woodworking Operations

New Construction Forms

Other Forms