Description

This project will make sidewalk and street improvements on 7th Avenue from Mountain View Road to Cheryl Drive and on Mountain View Road from 7th Avenue to 3rd Drive.  The project includes constructing new sidewalks where none currently exist, reconstructing and widening existing sidewalks to meet new city ADA standards, installing new ADA sidewalk ramps, constructing new driveways and reconstructing existing driveways, installing curb and gutter, street paving, removing and replacing catch basins, relocating fire hydrants and installing new LED streetlights.


 

Project Highlights

  • New sidewalks
  • New driveway construction and driveway reconstruction
  • New and reconstructed ADA ramps
  • Street paving
  • New street lighting

Goals of the Project

  • Improve pedestrian access and connectivity, and meet new Americans with Disability Act (ADA) guidelines.

Anticipated Schedule

  • Design: Spring 2020 – Spring 2021     
  • Start of Construction: Late 2021 