The Capital Improvement Program (CIP) in the Street Transportation Department includes a comprehensive pavement maintenance program, improvements to existing streets for mobility and safety issues, technology upgrades to signals, building new street and drainage infrastructure, expanding roadways, and much more. The five year program will provide over $750 million in improvements to our infrastructure. Please see the document below for more detailed information.
Phoenix Capital Improvement Program 2020-2025
The list below also contains other major projects that are funded through federal transportation funds or special grants. These projects follow the same planning/design/construction process.
3rd Street Rio Salado to Lincoln Street Connector & Rio Salado Bike/Ped Bridge
19th Avenue and McDowell Road (Railroad Project)
Downtown North-South Bikeway Study
Garfield-Edison Park Proposed Bike Improvements (Villa/Fillmore Bike Boulevard)
Hatcher Road Improvement Study: 19th Avenue to Central Avenue
Laveen South Mountain Transportation Study
McDowell Road Revitalization Project (7th Street to SR-51)
Tempe/Phoenix Freight Study Design Concept Report
West Phoenix Transportation Study
Downtown Transportation Plan Update
Transportation 2050 Mobility Studies
Maryvale Village Transportation Study
3rd and 5th Avenues Improvement Project (North of McDowell Road)
7th Avenue and Mountain View Road Improvement Project
13th Street: Van Buren to Moreland Street Improvement Project
19th Avenue and Sunnyside Pedestrian Safety Improvement Alternatives
20th Street Improvement Project
27th Avenue: Lower Buckeye to Buckeye Rd Improvement Project
32nd Street: Cheryl Drive to Cholla Street Improvements
35th Avenue: Camelback to Glendale Avenue Improvement Project
35th Avenue Safety Corridor: I-10 to Camelback Road (BUILD Grant)
43rd Avenue Improvement Projects
56th Street: Thomas Road to Camelback Road
Buckeye Road: 67th to 59th Avenues Improvement Project
Cave Creek Road Improvement Project
Colter Street: 15th Avenue to 20th Street
Grand Canalscape Phase 3: 75th to 47th Avenues
Happy Valley Road: 67th to 35th Avenues
Lower Buckeye Road: 27th to 19th Avenue Improvement Project
Mobility Area 3: Durango Curve Neighborhoods
Mountain View to Peoria Avenue, 15th to 7th Avenues Safe Routes to School Project
Sidewalks and Mobility Projects (Multiple)
Van Buren Street Enhancement Project (7th to 24th Streets)
Western Canalscape: 4th Avenue to 24th Street
27th Avenue and Thomas Road Railroad Crossing Improvements
31st Street: Thunderbird to Hearn Road Improvement Project
35th Avenue and Harrison Railroad Crossing Improvements
43rd Avenue: Anthem Way to Circle Mountain Road
48th Street South of Baseline
Baseline Road Fiber Optic Installation
Indian School Road Fiberoptic Installation
Pinnacle Peak Road (45th to 35th Avenues): Street and Storm Drain Improvements
3rd and 5th Avenues Improvement Project (South of McDowell Road)
3rd Street Improvement Project
7th Street Bridge Rehabilitation at the Union Pacific Railroad
7th Street Salt River Bridge Reconstruction
16th Place to 17th Street: Wier to Tamarisk Avenue Improvement Project
43rd Street: McDowell Road to Palm Lane
Downtown Mobility Area Street Lighting Installation
Downtown Traffic Management System
Fillmore from Central Avenue to 7th Street Proposed Bike Lanes
Grand Canalscape: Phases 1 and 2 (East of I-17 to Tempe border)
North Phoenix Infrastructure
Oak Street Improvement Project
Palm Lane: 28th to 32nd Streets Storm Drain Project
Roeser Road: 37th to 32nd Streets Improvement Project
Roosevelt to Moreland Street: 33rd to 34th Avenues Improvement Project
3rd Avenue: Camelback Road to Missouri Avenue (Pedestrian Improvement)
7th Street and 7th Avenue Reverse Traffic Lanes Study