This local street improvement project will replace the deteriorated pavement and fill gaps in the existing curb, gutter and sidewalk on 31st Street between Thunderbird and Hearn Roads. 

Project Highlights

  • New continuous curb, gutter and sidewalks on both sides of the street
  • 8 new ADA accessible sidewalk ramps
  • New storm drain system and catch basins
  • New asphalt pavement

Goals of the Project

  • Improve pedestrian safety and accessibility
  • Improve the roadway condition
  • Address existing drainage issues on 31st Street

Anticipated Schedule

  • Design: Winter 2019 to Winter 2020
  • Construction is expected to begin Spring 2021 