31st Street, Thunderbird to Hearn Road Project

​​​​​​​​​​​​​​​​​

Description

This local street improvement project will replace the deteriorated pavement and fill gaps in the existing curb, gutter and sidewalk on 31st Street between Thunderbird and Hearn Roads. 

Project Highlights

  • New continuous curb, gutter and sidewalks on both sides of the street
  • 8 new ADA accessible sidewalk ramps
  • New storm drain system and catch basins
  • New asphalt pavement

Goals of the Project

  • Improve pedestrian safety and accessibility
  • Improve the roadway condition
  • Address existing drainage issues on 31st Street

Schedule

  • Design anticipated to be complete July 2022
  • Construction is anticipated to begin Fall 2022 
View Detailed Design Plan

Project Contact

Michael Cano
(602) 262-4054
michael.cano@phoenix.gov

Updated November 2022

 Project Area